Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    GOP claims Democrats aim to raise taxes on seniors

    August 18, 2026

    Cat goes viral for life-saving ‘titanium skull’

    August 18, 2026

    Millions could be shielded from Social Security seizures under new bill

    August 18, 2026
    Facebook X (Twitter) Instagram
    Trending
    • GOP claims Democrats aim to raise taxes on seniors
    • Cat goes viral for life-saving ‘titanium skull’
    • Millions could be shielded from Social Security seizures under new bill
    • Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects
    • 13 Steps to Build a Reliable Habit Stacking Routine
    • The Latest Inflation Report Just Hinted at the 2027 Social Security COLA
    • Can you get Social Security and disability payments at the same time? The answer may surprise you
    • 7 Things to Try When Affirmations Just Aren’t Working for You
    Moving MountainsMoving Mountains
    Facebook X (Twitter) Instagram
    Tuesday, August 18
    • Home
    • Mental Health
    • Life Skills
    • Self-Care
    • Well-Being
    • Awareness
    • Inspiration
    • Workers Comp
    • Social Security
      • Injuries
      • Disability Support
      • Community
    Moving MountainsMoving Mountains
    Home » Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects
    Community

    Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects

    TECHBy TECHAugust 18, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    A panorama of Boston – credit, Rokker, CC 3.0.

    Expected to see 10 to 18 inches of sea level rise over the next 25 years, the city of Boston and the US Army Corps of Engineers have released a feasibility study for 20 separate infrastructure projects to protect the historic city’s coastline.

    The study estimates that if nothing is done, costs to the city’s historic buildings, neighborhoods, but particularly to the transportation systems from flooding could reach as much as $54 billion by 2090.

    The study therefore outlines a fifth of that estimated cost in investments towards infrastructure projects that will prevent the increased impacts of flooding in the decades leading up to that date. The projects will come in stages, just as the worsening impacts of predicted sea level rise are expected to.

    “The reality is that doing nothing is not a viable option. Without action, the costs to public safety and economic vitality from coastal flooding will only be compounded,” said Lt. Col. David MacPhail, deputy commander of the Corps New England District, in a statement.

    The planning strategies, according to the feasibility study summary, focused on finding different ways to manage storm risks both today and in the future under several different sea level change scenarios, and according to each neighborhood’s needs and capacities—a substantial challenge with even more substantial uncertainties.

    The USACE estimates, however, that virtually the entirety of Boston will experience inundation during a 100-year storm event over the next 64 years.

    A map of Boston, with purple indicating flooding under intermediate sea level rises, and light blue under extreme rises – credit, US Army Corps of Engineers

    “The Army Corps project is a generational opportunity to receive federal funding to invest in our coastline, but Boston needs a strategy that is viable and implementable to meet the match,” Rebecca Herst, Green Ribbon Commission associate director and director of climate resilience, told Engineering News Record.

    The projects would span some 16 miles of urban coastline, from above Powder Hill in the north to Columbine Cliffs in the south.

    MORE BOSTON NEWS: Bostonians Wanted More Bike Lanes: Now They Have Them, and Traffic Is Down

    Though the executive summary mentioned seawalls as a potential measure, no concrete ideas are yet proposed since the monumental investment costs are so variable.

    Nonetheless, consultations over engineering effectiveness, economic opportunities, and environmental impacts of any ideas either proposed by the Commission’s coastal resilience task force, or by other “resource agencies and stakeholders,” were held, during which time federal government interest was also confirmed.

    PREVENTING THE WORST EFFECTS OF CLIMATE CHANGE: The New Orleans Levees Held – Passing Their First Major Test Since Hurricane Katrina

    “The future of our city depends on the steps we take now to build resilient communities,” popular first-term Boston City Mayor Michelle Wu said in a statement. “With more frequent flooding in vulnerable areas during extreme weather events, the Coastal Storm Risk Management Feasibility Study is critical to understanding how to protect inland neighborhoods most at risk and unlocking resources to take action.”

    The task force plans to finalize its financial blueprint by next summer, coinciding with the Corps’ final feasibility study. The agency will accept public comment on the analysis through September 18th.

    SHARE This Important Story Of A City Planning For The Future With Your Friends…

    100year aims Billion Boston Flood Infrastructure projects risks tackle
    TECH
    • Website

    Related Posts

    Cat goes viral for life-saving ‘titanium skull’

    August 18, 2026

    11-week-old puppy fulfills hospice patient’s last wish

    August 18, 2026

    Threatened Bird Species Given Tiny Foot Casts to Help Recovery After Hit by Car

    August 18, 2026
    Leave A Reply Cancel Reply

    Don't Miss
    Social Security

    GOP claims Democrats aim to raise taxes on seniors

    By TECHAugust 18, 20260

    Republicans have launched a new line of attack against Democrats ahead of the 2026 midterms—claiming…

    Cat goes viral for life-saving ‘titanium skull’

    August 18, 2026

    Millions could be shielded from Social Security seizures under new bill

    August 18, 2026

    Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects

    August 18, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Our Picks

    GOP claims Democrats aim to raise taxes on seniors

    August 18, 2026

    Cat goes viral for life-saving ‘titanium skull’

    August 18, 2026

    Millions could be shielded from Social Security seizures under new bill

    August 18, 2026

    Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects

    August 18, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us

    At Moving Mountains, we believe that every individual has strength, value, and purpose—regardless of mental health challenges or physical disabilities. This platform was created to inspire hope, promote understanding, and empower people to live meaningful and confident lives beyond limitations.

    Latest Post

    GOP claims Democrats aim to raise taxes on seniors

    August 18, 2026

    Cat goes viral for life-saving ‘titanium skull’

    August 18, 2026

    Millions could be shielded from Social Security seizures under new bill

    August 18, 2026
    Recent Posts
    • GOP claims Democrats aim to raise taxes on seniors
    • Cat goes viral for life-saving ‘titanium skull’
    • Millions could be shielded from Social Security seizures under new bill
    • Boston Aims to Tackle 100-year Flood Risks with $10 Billion in Infrastructure Projects
    • 13 Steps to Build a Reliable Habit Stacking Routine
    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms & Conditions
    • Disclaimer
    © 2026 movingmountains. Designed by Pro.

    Type above and press Enter to search. Press Esc to cancel.